In our NC Solutions database you will find solutions for frequently required tasks

Set datum at the highest determined Z coordinate

Set datum at the highest determined Z coordinate

NC8210

NC program for measuring the Z coordinate at several points and writing the coordinates of the highest point to a marker. The control then moves to the X/Y position of the highest point and sets the Z datum there. In a table, you define the positions at which the control is to measure the Z coordinate.

Product type

TNC 640 TNC 620 TNC 320 Milling in 3 axes (X, Y, Z) Milling in 3 + 2 axes (X, Y, Z + inclined axes) Milling in 5 axes (X, Y, Z + tilting axes) Machine control Measuring / probing Tables Calculations TNC7 NC program
Back to overview